Learning to rig from a crane op in Bakersfield instead of the book changed my whole approach
I used to be all about the book method on removals, always figured if the math checks out you're good. Then about 14 months ago I'm working a big valley oak removal outside Bakersfield with this old crane operator named Dwayne, and he stops me mid-cut to point out how my notch and my rigging line were fighting each other on a leaner. He said, "You're cutting for the book, not for this tree," and then walked me through how the load actually shifts once the piece starts to tip. I'd been running my hinge too thick on leaning stuff for years because that's what the manual says, and he showed me a thinner hinge with a set line that kept the butt from kicking back toward the house. I don't care what the cert class teaches you, watching a guy with 30 years on a stick read a tree in person beats any diagram. Now I walk every removal and rig it to that specific tree instead of the textbook. Has any of you had someone call out your rigging on the spot like that, and did it stick?