Spent 5 hours trying to figure out why my site plan drawing wouldn't line up with the actual trench
I was working a small dig site outside of San Marcos last spring and my grid lines kept drifting about 40 centimeters off from the datum point on paper. After 5 hours of remeasuring I found my tripod was set up on soft fill dirt that had settled overnight, and once I repositioned it the whole grid locked in. Has anyone else had their baseline shift on them mid-excavation?