Hot take: I don't care how fast you can pull a unit, I care if the logbook matches
There was a thread in a hangar break room in Wichita last week where three guys were bragging about swapping an ADIRU in under 40 minutes flat, and the whole room nodded like that was the goal. I get it, speed feels good when the plane is on the ground and the clock is running. But I've spent the last 3 weeks chasing a squawk that turned out to be a connector someone rushed and never wrote down, and the paperwork trail was 2 lines of chicken scratch in a binder. My point is simple: a 40 minute job with a sloppy sign-off costs the next guy 6 hours of head scratching. I would rather take 90 minutes, torque it right, and log the part number, serial, and the exact fault code I cleared. So who here actually checks the logbook history before they start tearing into a box, or am I the odd one?