The day a seized bottom bracket ate 6 hours and three customers walked
Last Thursday I had a 2011 Trek hybrid come in with a bottom bracket so seized the frame threads were stripped, and it took me 6 hours with a torch and a thread tap to save the frame. While I was stuck on it, three walk-ins got tired of waiting and left, which killed my whole day's ticket count. How do you all handle a job that goes sideways like that, do you eat the time and keep pushing or cut your losses and reschedule the small stuff?