I tried the string line trick on a tall gable and the bricks came out dead level
I was laying a gable end on a two story place out in Aurora last week and I kept fighting the line sagging in the middle. A guy I work with told me to try pulling the line tighter and putting a block under it at the halfway mark instead of just tying it off at the ends. I did that and over a 14 foot run the bricks came out dead level, no bow at all. I used to think the sag was just something you lived with and tapped the bricks to match the line, but this took me maybe 10 extra minutes and saved me a bunch of tapping. I checked it with a 4 foot level after every other course and it stayed true the whole way up. Has anyone else tried blocking the line on a long run, or do you just deal with the sag and eyeball it?