That 1/4 inch foam under my mortar tub saved my back on a 2,000 brick job in Rochester
Bought a $12 sheet of 1/4 inch closed cell foam at the hardware store in Rochester before a 2,000 brick job last week and set it under my mortar tub. I'd been fighting a sore lower back for years from stooping over wet mud all day and never thought about the tub height. The foam raised the board about an inch and a half and it made a bigger difference than the kneepads ever did. My helper laughed at me until he tried it on the saw horse side. Took me ten minutes to cut and it hasn't moved after three days of rain. Anyone else messing with their setup height or am I the only one who missed this for so long?