A slipped tongue and groove on my deck job cost me a whole Saturday in Fort Worth
I was laying composite boards on a 12 by 16 deck last weekend and one board sat about 3/16 inch proud. Figured I could tap it flush and move on. Two hours later I had pulled up six boards because the gap walked all the way down the run. Turned out my joist spacing drifted near the house end, so the hidden clips had nowhere to bite. Ended up re-blocking that section with scrap 2x4 at noon and lost the whole day. Anybody got a fast way to check joist spacing before you start laying boards?