Showerthought: the $340 I lost on a handshake deal at a Dayton trade show made me put everything in writing
Two years back I shook hands with a guy at a vendor booth in Dayton, Ohio over 40 custom brackets at $8.50 each and figured that was that. He kept pushing the delivery date and then ghosted me, and I ate the cost of the material plus rush shipping to my own client. Now I carry a one-page order sheet in my truck and make even the small jobs sign it before I touch the mill. It felt dumb and stiff at first but I have not lost a dime since. How do you handle the small handshake jobs without coming off like a lawyer?