Lost 3 hours on a single drop in a 1950s house and I'm still mad about it
Last Tuesday I got sent out to a place off Magnolia Ave in Fort Worth, older home, and what should've been a 45 minute install turned into a whole afternoon. The homeowner had done some "remodeling" himself and walled right over the old coax plate, so I'm poking around trying to find where the line even comes in. Turned out every wall cavity was stuffed with blown-in insulation and old knob and tube, so no fish tape was going anywhere. I ended up going around the whole exterior of the house to find a path, and the crawlspace was so tight I had to army crawl through spider webs with a headlamp to reach the other side. By the time I got the line run and tested, I'd used up 3 hours on one drop and my back was toast. Then the guy had the nerve to ask if I could also mount his TV "real quick" since I was already there. What do you all tell folks who pull the "while you're here" thing at the end of a job like that?