The Tuesday afternoon in March when the chips finally flew right
About six years back I ran a 3 axis mill in a small shop outside Dayton and most weeks were the same grind, but one Tuesday in March everything just clicked. I had a batch of 40 aluminum brackets to run and the first part came off the vise with chatter marks all over the finish, so I dropped the spindle speed from 8000 to 6500 and bumped the feed a touch, and after that the chips came off blue and curly like they're supposed to. Ran all 40 in about five hours with zero scrap and every single one checked dead on at 2.000 inches on the bore. My lead walked by and just nodded, which for him is basically a parade. What made it stand out was the tool life too, that same end mill lasted the rest of the shift when I usually eat two of them on a run that size. I remember driving home and not even being tired, which never happens. Has anyone else had one of those days where you change two numbers and the whole job turns around?