Rant: the pour at the Maple Street job went sideways when the truck showed 45 minutes late
We had 12 yards to place and the first mixer rolled in at 7:45 instead of 7:00, so the second load caught the edge set on the first. Had to cut a cold joint right through the middle of the slab and the GC was not happy about it. Anyone got a good way to speed up the set time talk with the plant when they start running behind?