Pushing everyone toward full BIM on every job is a mistake, and a bad field survey on a Tuesday showed me why
I lost half a day at a 6,000 sq ft remodel in Gary because the model showed a wall 8 inches off from where it really sat, so I had to stop and shoot the room by hand. Not every crew needs a full model, sometimes a tape and a good sketch beat a shared file, so what software actually works for the small crews out there?