29
Vent: A job in Phoenix last summer made me switch up my concrete mix for good.
The heat was so bad the standard bag mix was setting before I could get the post plumb. I started adding a retarder and mixing with cold water, which gave me the extra 5 minutes I needed. Anyone else in a hot climate have a go-to mix adjustment?
3 comments
Log in to join the discussion
Log In3 Comments
paigesullivan16d ago
So you basically invented iced concrete?
2
lisa516d ago
Phoenix heat is no joke, good call on the cold water. @paigesullivan, iced concrete is basically what it takes out there.
1
noahcampbell14d ago
Is it actually that bad though? People live there year round, right? What do they do, just walk around with ice packs all summer?
9