Vent: A job in Phoenix last summer made me switch up my concrete mix for good.
The heat was so bad the standard bag mix was setting before I could get the post plumb. I started adding a retarder and mixing with cold water, which gave me the extra 5 minutes I needed. Anyone else in a hot climate have a go-to mix adjustment?