Rant: my old boss in Lansing laughed at me for pre-drilling every joint, now he does it too
Six months ago I was building a set of oak cabinet doors and kept splitting the stiles right at the screw holes, lost 4 boards in one afternoon. My old boss watched me pre-drill every hole with a 3/32 bit and said I was wasting time, that real carpenters just drive them in. Then we hit a job with 40 doors and I watched him split the same rail twice in a row while the client stood right there. He borrowed my bit and never gave it back. I still keep a small block with the bit sizes written on it in my apron. Does anyone here keep a drill chart on the bench, or do you just know the sizes by now?