Rant: The difference a year makes on this old house rehab I took on
I started a full gut rehab on a 1920s craftsman in Portland back in March. The before photos show knob and tube wiring, plaster dust everywhere, and a foundation that was basically holding on by a prayer. Fast forward to last week and I finally got the last of the trim up in the living room. It took me 14 months, three different subs bailing on me, and about $47,000 more than I budgeted. The biggest change was the floor system - we sistered 27 joists after finding termite damage in the back half. What kind of timeline shifts have you guys run into when you uncover hidden rot or structural issues?